1000 kVA Three Phase Oil Power Distribution Transformer
Model:S13/22-M
The S13/22-M 1000 kVA Three Phase Oil Power Distribution Transformer is a high-performance industrial power distribution core equipment independently R&D and manufactured by Jinhand Electrical, tailored for 50Hz, ≤10kV power grid systems.
The S13/22-M 1000 kVA Three Phase Oil Power Distribution Transformer is a flagship medium-capacity product of Jinhand Electrical, a leading manufacturer and direct factory supplier of electrical equipment in China, exclusively engineered for 50Hz/10kV standard industrial power systems.
Advantages
1.Fully Sealed Structural Design:The transformer adopts an integrated fully sealed structure. All flanges, terminals and joints are sealed with high-temperature and oil-resistant materials, isolating internal oil, core and windings from outside air.
2. Low Maintenance & High Durability:This design prevents oil aging, moisture emulsification and internal dust accumulation. It greatly improves equipment durability and reduces daily maintenance by more than 90% vs. traditional open-type transformers.
3. Optimized for ≤10kV Power Systems:The product is specially designed for ≤10kV power systems, with strong adaptability to industrial and distribution scenarios.
MAIN TECHNICAL PARAMETERS
Rated capacity
Voltagecombination(kV)High Tapping Range of Low pressureHigh voltagepressure
ConnectionGrouplabel
No-Loadloss(W)
ShortCircuitimpedance
Weight
External dimensions
Trackgauge
Oil
Totalweight
Length
Width
Height
30
66.36.61010.511
±5% or ±2×2.5%
0.4
Yyn0 Dyn11
80
4
65
250
705
445
850
400×400
50
100
75
320
745
500
880
400×400
63
110
85
375
775
515
965
400×400
80
130
95
425
790
590
985
400×400
100
150
100
480
820
640
1005
400×400
125
170
110
540
835
710
1030
550×550
160
200
120
625
865
740
1030
550×550
200
240
145
750
1085
680
1110
550×550
250
290
160
860
1175
755
1130
550×550
315
340
175
980
1190
765
1175
550×550
400
410
200
1180
1275
825
1210
660×660
500
480
225
1350
1325
880
1280
660×660
630
570
4.5
260
1580
1420
935
1315
660×660
800
700
285
1835
1490
985
1375
820×820
1000
830
350
2170
1690
1220
1395
820×820
1250
970
410
2645
1825
1305
1460
820×820
1600
1170
470
3240
1825
1270
1515
820×820
2000
1380
540
2860
2085
1235
1715
1070×1070
2500
1680
600
4435
2130
1255
1805
1070×1070
Model
Ratedcapacity
Electric loadcombination
Connectionsymbol
No-load loss(W)
DY Loadloss(W)
YY Loadloss(W)
No-loadcurrent(%)
Highpressure
Tapping range
Lowpressure
S22-M-30/10-NX1
30
66.36.61010.511
±5%±2×2.5%
0.4
Yyn0 Dyn11
65
455
430
1.5
S22-M-50/10-NX1
50
80
655
625
1.3
S22-M-63/10-NX1
63
90
785
745
1.2
S22-M-80/10-NX1
80
105
945
900
1.2
S22-M-100/10-NX1
100
120
1140
1080
1
S22-M-125/10-NX1
125
135
1360
1295
1.1
S22-M-160/10-NX1
160
160
1665
1585
1
S22-M-200/10-NX1
200
190
1970
1870
1
S22-M-250/10-NX1
250
230
2300
2195
0.9
S22-M-315/10-NX1
315
270
2760
2630
0.9
S22-M-400/10-NX1
400
330
3250
3095
0.8
S22-M-500/10-NX1
500
385
3900
3710
0.8
S22-M-630/10-NX1
630
460
4460
0.6
S22-M-800/10-NX1
800
560
5400
0.6
S22-M-1000/10-NX1
1000
665
7415
0.6
S22-M-1250/10-NX1
1250
780
8640
0.5
S22-M-1600/10-NX1
1600
940
10440
0.5
S22-M-2000/10-NX1
2000
1085
13180
0.5
S22-M-2500/10-NX1
2500
1280
13360
0.5
Production Process Advantages
1.Advanced Manufacturing and Precision Processing Technology:High-precision lamination and vacuum annealingAdopt CNC shearing and folding machine for precision cutting, step-by-step lamination process to ensure the uniformity of the magnetic circuit; the core is subjected to vacuum annealing treatment to eliminate internal stress, reduce iron loss by 15% and improve magnetic conductivity significantly.
2.Strict and Comprehensive Full-Process Quality Control System:In accordance with ISO9001 quality management system standards, Jinhand Electrical has established a full-process quality control system covering raw material procurement, production processing, product assembly and finished product testing for the S13/22-M 1000 kVA transformer, with 18 quality inspection links and 4 full-inspection nodes, ensuring a factory qualification rate of 100%.
3.Key Core Technology Advantages:The R&D team has independent intellectual property rights for the electromagnetic design of medium-capacity transformers, using finite element simulation analysis software to optimize the core and three-phase winding layout, realizing the optimal matching of loss, volume and noise, and ensuring the high efficiency and low noise operation of the 1000 kVA model.
Green Energy-Saving Characteristics
1.Ultra-Low Loss Energy-Saving Design, Exceeding International Energy Efficiency Standards:Low-loss core design: Adopt 30Q120 high-grade cold-rolled oriented silicon steel sheets with ultra-low iron loss 1.2W/kgat1.7T,50Hz, which is 30% lower than ordinary silicon steel sheets in iron loss, effectively reducing the no-load loss of the transformer.
2.Environmentally Friendly and Non-Toxic Materials, Complying with International Environmental Standards:All insulating materials comply with the EU RoHS directive, free of lead, mercury, cadmium and other heavy metals, and non-toxic and harmless during production, use and disposal, avoiding environmental pollution.
3.Low-Carbon Operation and Green Production, Contributing to Sustainable Development:The ultra-low loss design makes the 1000 kVA model save about 8,000 kWh of electricity per year under 80% load rate, reducing carbon emissions by about 10 tons per year, contributing to the carbon neutrality goal of industrial enterprises.
Supply Chain Advantages
1.Stable and High-Quality Raw Material Supply System:We have established long-term exclusive strategic cooperation relationships with well-known domestic and foreign raw material suppliers.
2.Strong Customized Production Capacity for 1000 kVA Model:We have a 50+ person professional R&D team including 10 senior engineers and 20 electrical design experts, who can provide personalized customized design for the 1000 kVA model according to the customer's specific application scenarios (such as special environment, special installation space), power grid conditions and special requirements.
3.Rapid Market Response and On-Time Delivery Capability:The production cycle of the standard S13/22-M 1000 kVA model is only 30-45 days, which is 15-20 days shorter than the industry average of 50-60 days, ensuring the rapid delivery of customer orders.
Customer Service
1.Professional Pre-Sales Consultation and Scheme Design:Our professional sales engineers and technical engineers provide one-to-one pre-sales consultation services for customers, in-depth understanding of the customer's power grid conditions, application scenarios, power supply requirements and installation space, and conduct a detailed demand analysis to provide targeted product selection suggestions.
2.Thoughtful In-Sales Support and Production Tracking:After the order is confirmed, we assign a special customer manager to the customer, who provides real-time production progress tracking services, sends production progress photos and videos to the customer every week, and notifies the customer of any production problems in a timely manner, ensuring the customer's right to know.
3.Comprehensive After-Sales Maintenance and Fault Handling:We have a 24-hour uninterrupted technical service hotline and online customer service (WeChat, WhatsApp, Email), with a professional technical service team on duty 24 hours a day, providing real-time solutions to the customer's equipment operation, maintenance and fault problems, with a response time of less than 1 hour.
FAQ
Q1: Does the fully sealed transformer require regular oil changes?
A: No, under normal operating conditions, oil changes are not required. The fully sealed design effectively prevents oil oxidation and moisture ingress. However, we recommend oil sample testing every 5–8 years to monitor insulation condition.
Q2: Can the transformer be installed outdoors?
A: Yes, it is suitable for outdoor installation with an IP54 protection rating. To further extend service life, we recommend adding a sun and rain shield, especially in extreme weather conditions.
Q3: Is parallel operation supported?
A: Yes, parallel operation is possible provided that all units have matching rated parameters, including voltage ratio, short-circuit impedance, and connection group, and that proper phase sequence is ensured.
Q4: What is the typical delivery time?
A: For standard models, delivery takes approximately 30–45 days. For units with large capacity or special customization requirements, lead time will vary based on the specific configuration. Please contact our sales team for a detailed schedule.
Loading & Shipment
Thanks to our consistent product quality and reliable service, we have built long-term partnerships with customers in over 30 countries worldwide. We offer flexible trade terms including EXW, FOB, and CIF, and provide full logistics support—from professional export packaging and accurate documentation to real-time shipment tracking—ensuring your order arrives safely and on time.
Contact us
With over a decade of strategic growth, Jinhand has established itself as a leading manufacturer and supplier of electrical equipment in China. Our factory is equipped with cutting-edge technology and advanced production lines, enabling us to deliver high-performance, competitively priced products. We welcome global partners to experience the quality and value of Jinhand—where Chinese manufacturing excellence meets international standards.
Hot Tags: 1000 kVA Three Phase Oil Power Distribution Transformer, China, Manufacturer, Supplier, Factory
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies.
Privacy Policy